Maruchek’s makeshift manufacturing facility has three departments: shaping, pickling, and packing. Maruchek’s orders average 100 pieces per order. Each of the three shaping machines requires 1 hour to set up and can run one piece per minute. The pickling department lowers baskets into brine tanks and subjects them to low-voltage current, heating and cooling, and a rinse. The whole process takes four hours for any number of baskets or pieces. One brine tank is available and it is capable of processing four baskets at one time. Each basket can hold 50 pieces. Baskets are loaded while a load is being processed in the tank. Each piece is inspected and wrapped in bubble pack in the packing department. Each of the four people in the department can do this at the rate of 25 pieces per hour. Maruchek has heard of optimized production technology (OPT) and wants to identify the bottleneck in his department. Assuming that we have enough labor to set up all of the shaping machines at the same time.

Previous answers to this question


This is a preview of an assignment submitted on our website by a student. If you need help with this question or any assignment help, click on the order button below and get started. We guarantee authentic, quality, 100% plagiarism free work or your money back.

order uk best essays Get The Answer
Uncategorized

Leave a Reply

Your email address will not be published. Required fields are marked *