{"id":80768,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/reliability-engineering-2"},"modified":"2017-08-18T07:42:23","modified_gmt":"2017-08-18T07:42:23","slug":"reliability-engineering-2","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/reliability-engineering-2\/","title":{"rendered":"Reliability Engineering"},"content":{"rendered":"<p>Topic: Reliability Engineering<\/p>\n<p>Paper details:<\/p>\n<p>1<br \/> Memorial University<br \/> Faculty of Engineering &amp; Applied Science<br \/> Reliability Engineering, ENGI 9116<br \/> Take Home Final Examination<br \/> Date: April 11-15, 2016 (on or before 10 AM)<\/p>\n<p>Evaluation: 30% Faisal Khan<br \/> Question paper has two sections (A and B) and four pages<br \/> Please submit your final exam in Bruneau Centre (IIC 1008)<br \/> Section A (12%)<br \/> 1. Below is the reference of a research paper on risk-based inspection modeling. Please read<br \/> this and provide me a summary of what has been done here, how it is done, and how you<br \/> could improve this work? [Use Times Roman Font with 12 point size with 1.5 line spacing;<br \/> the paper should not exceed two pages]<br \/> Shekari, E, Khan, F, and Ahmed, S (2016) A predictive approach to fitness-for-service<br \/> assessment of pitting corrosion, Journal of Pressure Vessels and Piping, 137 (2016) 13-21.<br \/> (4%)<br \/> 2. A photo detector counts photons for 10 nano seconds to decide if a distant light source is<br \/> emitting light. When the light source is not emitting light, some photons are still counted by<br \/> the detector due to the ambient background radiation. The number of photons counted in 10<br \/> nanoseconds is modeled as a random variable X whose parameter ? has value ln(9) if the<br \/> light source is not emitting light, and value ln(27) if the source is emitting light. The<br \/> maximum-likelihood detector decides that detection of light is the true if and only if the<br \/> likelihood ratio = probability of detection when light is present (x)\/probability of detection<br \/> when light is not present (x) exceeds 1. (a) What value(s) of X result in a decision in favor<br \/> of detecting of light? (b) Compute the false alarm probability PFA and the missed detection<br \/> or false dismissal probability PMD of the maximum-likelihood decision rule.<br \/> (2%)<br \/> 3. 100 AIDS patients were given a new drug test. The results were as follows:<br \/> Year on drug Number of deaths Number of withdrawals<br \/> 1 5 2<br \/> 2 8 4<br \/> 3 12 2<br \/> 4 18 10<br \/> 5 24 12<\/p>\n<p>Withdrawals occurred when patients left the test area or died from causes not related to the<br \/> AIDS disease. Construct a life table to estimate the probability (reliability) that a patient<br \/> will survive at least five years.<br \/> (2%)<br \/> 2<br \/> 4. Determine the minimum-cost trade-off between the MTBF and the MTTR for a system<br \/> requiring 0.99 availability. The MTTR must be between 10 and 30 hr, and the MTBF must<br \/> be at least 1000 hr. Consider the cost functions as:<br \/> a. C(x) = 0.0002x<br \/> 2<br \/> ; C(y) = 12500\/y<br \/> b. C(x) = 2x; C(y) = 2000-y<br \/> 2<br \/> (2%)<br \/> 5. The Breakit Company manufactures anti-clock disk brakes (ABS) for use in automobiles.<br \/> An essential part of the manufacturing process is the factory assemble and integration<br \/> linking (FAIL) system. Unfortunately, this system has experienced numerous failures over<br \/> the years under minimal repair concept that is a non-homogeneous Poisson process having<br \/> an intensity function ?(t)=1.15\u00d710<br \/> -7<br \/> t<br \/> 1.3<br \/> with t measured in operating hours. The system<br \/> averages 2000 operating hours a year and it currently 5 years old. When the system fails,<br \/> the repair time is lognormal with tmed = 6.2 hours and s = 1.2.<br \/> a. When the system was new, its manufacturer offered a 500-operating-hr warranty.<br \/> What is the system reliability during the warranty period?<br \/> b. When the system fails, it takes a crew of two to repair it. If the labor rate is $50 per<br \/> hour and based upon the MTTR, what is the maintenance cost of the FAIL system<br \/> during its 6<br \/> th<br \/> year of operation?<br \/> c. If the cost of the system is $30,000, what is its optimal (minimum cost) replacement<br \/> time?<br \/> d. Management believes that a preventive maintenance (PM) program may be cost<br \/> effective. A PM consists primarily of replacing certain parts having a cost of $700<br \/> and thus restoring it to as-good-as-new condition. If it takes one technician 4 hours<br \/> to do this, what is the optimum (minimum cost) PM interval?<br \/> (2%)<br \/> Section B (18%)<br \/> Note: Solve the following problems:<br \/> (Each 3.0 %)<br \/> 6. External corrosion is a potential failure mechanism of buried natural gas pipeline. Once the<br \/> protective coating and\/or the cathodic protection system fail the external corrosion rate<br \/> depends largely on the characteristics of the surrounding soil. The corrosion rate is<br \/> typically modeled using an empirical power-law relationship as: ? = ??<br \/> !<br \/> where y is the<br \/> corrosion depth, t is the exposure time, and A and n are site dependent constants, with n<br \/> typically less than 1. Below is the data available from a specific site. Estimate the failure<br \/> probability of 40 mm pipeline in 20 years. Pipeline failure may be defined as loss of 66%<br \/> of the pipeline thickness.<br \/> 3<br \/> Time (years) Corrosion depth (mm)<br \/> 0 0<br \/> 1.5 2.5<br \/> 3.5 5.0<br \/> 5.0 8.5<br \/> 8.5 11.0<br \/> 12.0 13.5<br \/> 15 14.0<br \/> 17 14.5<br \/> 19 15.0<br \/> 7. An offshore platform consists of three large main power generators (MPGs), two operating<br \/> and one spare (standby mode). The lifetime of each MPG follows the Weibull distribution<br \/> with beta = 2.3 and theta = 40 years. In a given time, two MPGs are used, while third one<br \/> can be used to replace a failed unit in 12 days with a cost of $ 5 million. The failure of each<br \/> additional unit requires the procurement and installation of a brand new transformer with a<br \/> cost of $ 280 million. Estimate failure probability and associated risk with the MPGs over<br \/> the next 20 years of operation considering both scenarios (spare is available as good as new<br \/> and spare is in failed state).<br \/> 8. The load (S) and resistance (R) are modeled as log normally distributed random variables<br \/> with the following parameters: the mean and coefficient of variation (CoV) of the load are<br \/> 160 kN and 0.15, respectively, while the CoV of resistance is given as 0.28. a) If the<br \/> design criterion is R = S, then what should be the mean resistance? Assume the nominal<br \/> resistance (R) is the 5th percentile of the distribution; b) what is the probability of failure<br \/> for design criterion R = S?; and c) what is reliability index?<br \/> 9. A repairable system consists of three non-identical components A, B and C, all of which<br \/> must work for system success. When one component fails, no further component failures<br \/> can occur. Construct the relevant state space diagram and hence evaluate general<br \/> expressions for the individual limiting state probabilities in terms of component failure and<br \/> repair rates. Evaluate the unavailability of the system in hour\/year if the three components<br \/> have the following reliability data.<br \/> Component Mean time to Failure (yr) MTTR (hours)<br \/> A 1.0 180<br \/> B 2.0 12<br \/> C 1.0 52<br \/> 10. The figure below shows the pipe layout in a lawn sprinkler system. Sprayers are located at<br \/> every intersection of the pipe and also at the corners of the system. Thus there are 16<br \/> sprayers. Two things can happen to a sprayer: it can break off or it can get clogged. If any<br \/> one of the sprayers breaks off, a great stream of water will pour forth and the system will<br \/> have failed. If one of the sprayers clogs, it will fail to water the lawn in the immediate<br \/> vicinity; however, adjacent sprayers can reach the affected areas. The system is judged to<br \/> 4<br \/> be failed if any two adjacent sprayers are both failed. For one sprayer, let the probability of<br \/> breakage be 0.01 and the probability of clogging be 0.05. Find the reliability of the system<br \/> (the probability that it does not fail in either mode).<\/p>\n<p>Layout of the sprinkler system<br \/> 11. A gas-fired furnace is shown below. The hot combustion gases pass through heat<br \/> exchanger to heat fresh air for space heating. The gas flow is controlled by an electric<br \/> solenoid valve connected to a thermoset. The gas is ignited by a pilot light flame. A hightemperature<br \/> switch shuts off all gas in the event of high temperature in the fresh air.<br \/> Develop fault tree using step-by-step approach for an event (scenario) \u201cNo Space Heating\u201d.<br \/> Powered by TCPDF (www.tcpdf.org) Powered by TCPDF (www.tcpdf.org) Powered by TCPDF (www.tcpdf.org) Powered by TCPDF (www.tcpdf.org) Powered by TCPDF (www.tcpdf.org) Powered by TCPDF (www.tcpdf.org)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Topic: Reliability Engineering Paper details: 1 Memorial University Faculty of Engineering &amp; Applied Science Reliability Engineering, ENGI 9116 Take Home Final Examination Date: April 11-15, 2016 (on or before 10 AM) Evaluation: 30% Faisal Khan Question paper has two sections <a href=\"https:\/\/www.benedictsol.com\/blogs\/reliability-engineering-2\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-80768","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/80768","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=80768"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/80768\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=80768"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=80768"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=80768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}