{"id":52483,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/risk-management-project-2-in-this-project-you-will-be-given-the-opportunity-to-demonstrate-your-understanding-of-the-risk-management-concepts-covered-in-this-and-previous-units-in-the-course"},"modified":"2017-08-16T12:46:28","modified_gmt":"2017-08-16T12:46:28","slug":"risk-management-project-2-in-this-project-you-will-be-given-the-opportunity-to-demonstrate-your-understanding-of-the-risk-management-concepts-covered-in-this-and-previous-units-in-the-course","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/risk-management-project-2-in-this-project-you-will-be-given-the-opportunity-to-demonstrate-your-understanding-of-the-risk-management-concepts-covered-in-this-and-previous-units-in-the-course\/","title":{"rendered":"Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course."},"content":{"rendered":"<p>Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course.<\/p>\n<p>Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussed in Chapters 14-27.<\/p>\n<p>Kinetic Energy Hazard, Electric Energy Hazard, Acoustic Energy and Vibration Hazards, Thermal Hazards: Heat and Cold, Fire Hazard, Explosion Hazards, Pressure Hazards, Hazards of Electromagnetic Energies, Hazards of Severe Weather and Geological Events, Workplace Condition and Chemical Substances<\/p>\n<p>Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing the risks, and evaluate the residual risks. Your submission should include the following:<\/p>\n<p>\u00b7A brief description of the workplace setting and an explanation of the tasks in this workplace.<\/p>\n<p>\u00b7Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and Effects<\/p>\n<p>Analysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.<\/p>\n<p>\u00b7Assessment of the identified risks before risk reduction efforts are applied, using a 5&#215;5 Risk Assessment Matrix.<\/p>\n<p>\u00b7Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tactics can be applied to each risk if needed.<\/p>\n<p>\u00b7Re-assessment of the risks after tactics are applied, using a 5X5 matrix.<\/p>\n<p>\u00b7Discussion of the residual risks, and whether you feel they are at a tolerable level.<\/p>\n<p>The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract, and reference pages. Use APA formatting where applicable.<\/p>\n<p>Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course.<\/p>\n<p>Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussed in Chapters 14-27.<\/p>\n<p>Kinetic Energy Hazard, Electric Energy Hazard, Acoustic Energy and Vibration Hazards, Thermal Hazards: Heat and Cold, Fire Hazard, Explosion Hazards, Pressure Hazards, Hazards of Electromagnetic Energies, Hazards of Severe Weather and Geological Events, Workplace Condition and Chemical Substances<\/p>\n<p>Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing the risks, and evaluate the residual risks. Your submission should include the following:<\/p>\n<p>\u00b7A brief description of the workplace setting and an explanation of the tasks in this workplace.<\/p>\n<p>\u00b7Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and Effects<\/p>\n<p>Analysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.<\/p>\n<p>\u00b7Assessment of the identified risks before risk reduction efforts are applied, using a 5&#215;5 Risk Assessment Matrix.<\/p>\n<p>\u00b7Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tactics can be applied to each risk if needed.<\/p>\n<p>\u00b7Re-assessment of the risks after tactics are applied, using a 5X5 matrix.<\/p>\n<p>\u00b7Discussion of the residual risks, and whether you feel they are at a tolerable level.<\/p>\n<p>The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract, and reference pages. Use APA formatting where applicable.<\/p>\n<p>Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course.<\/p>\n<p>Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussed in Chapters 14-27.<\/p>\n<p>Kinetic Energy Hazard, Electric Energy Hazard, Acoustic Energy and Vibration Hazards, Thermal Hazards: Heat and Cold, Fire Hazard, Explosion Hazards, Pressure Hazards, Hazards of Electromagnetic Energies, Hazards of Severe Weather and Geological Events, Workplace Condition and Chemical Substances<\/p>\n<p>Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing the risks, and evaluate the residual risks. Your submission should include the following:<\/p>\n<p>\u00b7A brief description of the workplace setting and an explanation of the tasks in this workplace.<\/p>\n<p>\u00b7Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and Effects<\/p>\n<p>Analysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.<\/p>\n<p>\u00b7Assessment of the identified risks before risk reduction efforts are applied, using a 5&#215;5 Risk Assessment Matrix.<\/p>\n<p>\u00b7Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tactics can be applied to each risk if needed.<\/p>\n<p>\u00b7Re-assessment of the risks after tactics are applied, using a 5X5 matrix.<\/p>\n<p>\u00b7Discussion of the residual risks, and whether you feel they are at a tolerable level.<\/p>\n<p>The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract, and reference pages. Use APA formatting where applicable.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course. Select a real or imagined workplace setting that involves <a href=\"https:\/\/www.benedictsol.com\/blogs\/risk-management-project-2-in-this-project-you-will-be-given-the-opportunity-to-demonstrate-your-understanding-of-the-risk-management-concepts-covered-in-this-and-previous-units-in-the-course\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-52483","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/52483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=52483"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/52483\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=52483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=52483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=52483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}