{"id":51352,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/managerial-accounting-budget-project"},"modified":"2017-08-16T12:34:50","modified_gmt":"2017-08-16T12:34:50","slug":"managerial-accounting-budget-project","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/managerial-accounting-budget-project\/","title":{"rendered":"managerial accounting budget project"},"content":{"rendered":"<p>Using the supplied Excel spreadsheet, complete the required elements contained in the BUDGET PROJECT &#8211; ACCT 2202 pdf file. &nbsp;You will be graded on:<\/p>\n<p>1) Your use of Excel formulas and reference cells to build a spreadsheet that functions, in all schedules, when performing &#8220;what-if&#8221; analysis by changing the assumptions located in the assumptions tab.<\/p>\n<p>2) The accuracy of the budgeted figures as derived from the formulas entered. &nbsp;Since I will be supplying you with check figures, simply hard keying those figures into their respective cells will not count.<\/p>\n<p>A general recommendation: there should not be any cell that doesn&#8217;t contain either a formula or a reference back to another cell located either in the assumptions tab or another schedule. &nbsp;Each cell identified with manual calculations or hard keyed figures will be deducted 10 points for each cell.<\/p>\n<p>Finally, a general warning: &nbsp;while I encourage you to work in groups on this project, each student will be graded by their individual spreadsheet submitted for grading. &nbsp;With that in mind, construct your own spreadsheet. &nbsp;There are several ways to track the origination of the spreadsheet, which should act as a deterrent from breaching academic integrity. &nbsp;Any files that are deemed to be someone else&#8217;s work will result in a zero for the project and further options will be pursued. &nbsp;There will be substantial opportunity to perform well on this project if those opportunities are harvested.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Using the supplied Excel spreadsheet, complete the required elements contained in the BUDGET PROJECT &#8211; ACCT 2202 pdf file. &nbsp;You will be graded on: 1) Your use of Excel formulas and reference cells to build a spreadsheet that functions, in <a href=\"https:\/\/www.benedictsol.com\/blogs\/managerial-accounting-budget-project\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-51352","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/51352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=51352"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/51352\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=51352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=51352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=51352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}