{"id":435081,"date":"2018-05-06T01:29:22","date_gmt":"2018-05-06T01:29:22","guid":{"rendered":"https:\/\/essaypaper.org\/whole-life-cycle-costing-dissertation-proposal\/"},"modified":"2018-10-24T08:52:26","modified_gmt":"2018-10-24T08:52:26","slug":"whole-life-cycle-costing-dissertation-proposal","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/whole-life-cycle-costing-dissertation-proposal\/","title":{"rendered":"Whole life cycle costing dissertation proposal"},"content":{"rendered":"<div>\n<div align=\"center\">\n\t\t\t <img decoding=\"async\" src=\"http:\/\/ihelptostudy.com\/other\/custom_top_article.gif\" alt=\"Order custom writing\"\/>\n\t\t<\/div>\n<div class=\"introimage\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ihelptostudy.com\/wp-content\/uploads\/whole-life-cycle-costing-dissertation-proposal_2.jpg\" width=\"463\" height=\"600\" alt=\"Whole life cycle costing dissertation proposal Construction Management, Glasgow Caledonian University\" title=\"Whole life cycle costing dissertation proposal Construction Management, Glasgow Caledonian University\"\/><\/div>\n<p>01 Dec 2015 00:03<\/p>\n<p>Aikivuori A (1996) Periods and demand for private sector&#13; housing refurbishment, Construction Management and&#13; Economics, 14: 3-12&#13; Al-Hajj A (1991) Simple cost-significant models for total lifecycle&#13; costing in buildings. PhD Thesis, Department of Civil&#13; Engineering, University Of Dundee&#13; Al-Hajj A (1996) Towards a better understanding of life&#13; cycle costing in buildings: a simple approach to modelling,&#13; Proceedings of the CIB W89 conference, Beijing, October 21-&#13; 24 1996&#13; Al-Hajj A and Horner M W (1998) Modelling the running costs&#13; of buildings, Construction Management and Economics, 16:&#13; 459-470&#13; Al-Hajj A and Aouad G (1999) Life cycle costing model&#13; using object oriented and VR technologies, Proceedings of&#13; the eighth international conference on durability of building&#13; materials and components, Vancouver, Canada, May 30 -&#13; June 3, 4: 2901-2908&#13; Anderson T and Brandt E (1999) The use of performance&#13; and durability data in assessment of life time serviceability,&#13; Proceedings of the eighth international conference on&#13; durability of building materials and components, Vancouver,&#13; Canada, 3: 1813-1820&#13; Aouad G, Child T, Marir F and Brandon P (1997) OSCON final&#13; report, University of Salford&#13; Ashworth A and Skitmore R M (1982) Accuracy in estimating.&#13; Chartered Institute of Building Occasional Paper No 27&#13; Ashworth A (1987) Life cycle costing \u2013 can it really work in&#13; practice? in Brandon P S (ed), Building cost modelling and&#13; computers, E  F N Spon, London&#13; Ashworth A (1989) Life cycle costing: a practice tool, Cost&#13; Engineering, 31(3): 8-11&#13; Ashworth A (1993) How life cycle costing could have&#13; improved existing costing, in Bull J W (ed), Life cycle costing&#13; for construction, Blackie Academic  Professional, Glasgow&#13; Ashworth A (1996a) Estimating the life expectancies of&#13; building components in life cycle costing calculations,&#13; Structural Survey, 14 (2): 4-8&#13; Ashworth A (1996b) Assessing the life expectancies of&#13; buildings for life cycle costing, Proceedings of the RICS&#13; construction and building research conference (COBRA\u201996),&#13; RICS&#13; Ashworth A (1999) Cost studies of buildings, Longman&#13; Asiedu Y and Gu P (1998) Product Life cycle cost analysis:&#13; state of the art review, International Journal of Production&#13; Research, 36 (4): 883-908&#13; ASTM (1983) Standard practice for measuring life-cycle&#13; costs of buildings and building systems, American Society for&#13; Testing and Materials, Designation: E917-83&#13; Bartlett E and Howard N (2000) Informing the decision&#13; makers on the cost and value of green building, Building&#13; Research  Information, 28 (5\/6): 315\u2013324&#13; Bhuta C and Sarma V (1997) Life cycle costs and early&#13; decision, Building Economist, March: 4-8&#13; BMI (2001) BMI Building maintenance price book 2001, RICS,&#13; London&#13; Bordass B (2000) Cost and value: fact and fiction, Building&#13; Research  Information, 28 (5\/6): 338-352&#13; Brandon P S (1987) Life cycle appraisal \u2013 further&#13; considerations, in Spedding A (Ed) Building maintenance&#13; economics and management, E  F N Spon, London: 153-162&#13; BSI (1974) BS3811: British standard glossary of maintenance&#13; of physical resources, Department of Industry&#13; BSI (1997) BS 5760: Reliability of systems, equipment and&#13; components, Part 23, Guide to life cycle costing, British&#13; Standard Institution&#13; BSI (2000,) BS ISO 15686-1:2000, Buildings and constructed&#13; assets: Service life planning: General principles, British&#13; Standard Institution&#13; Bromilow F J and Pawsey M R (1987), Life cycle cost&#13; of university buildings, Construction Management and&#13; Economics, 5, S3-S22&#13; Bromilow F J and Tucker S N (1983) Terotechnological&#13; optimality in construction, Construction Papers, 2 (1): 41-50&#13; Buckley J U (1987) The fuzzy mathematics of finance, Fuzzy&#13; Sets and Systems, 21: 257-273&#13; Bull J W (1993) The way ahead for life cycle costing in the&#13; construction industry, in Bull J W (ed) Life cycle costing for&#13; construction, Blackie Academic  Professional, Glasgow&#13; Byrne P (1995) Fuzzy analysis: a vague way of dealing&#13; with uncertainty in real estate analysis, Journal of Property&#13; Valuation and Investment, 3 (3): 22-40&#13; Byrne P (1996) Risk, uncertainty and decision-making in&#13; property development, E  F N Spon, London&#13; Byrne P (1997) Fuzzy D C F: a contradiction in terms, or a&#13; way to better investment appraisal?<!--image3begin-->\n<\/p>\n<div class=\"middleimage\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ihelptostudy.com\/wp-content\/uploads\/whole-life-cycle-costing-dissertation-proposal_1.jpg\" width=\"589\" height=\"600\" alt=\"Whole life cycle costing dissertation proposal costs of\" title=\"Whole life cycle costing dissertation proposal costs of\"\/><\/div>\n<p><!--image2end--> Proceedings of Cutting&#13; Edge 97, RICS&#13; CBPP (1998a) Introduction to whole life costing&#13; cbpp.org.uk\/cbpp\/word_docs\/whole_life_costing.doc&#13; CBPP (1998b) Business benefits for whole life costing&#13; cbpp.org.uk\/cbpp\/word_docs\/Whole_Life_Costing_&#13; Business_Benefits.doc&#13; Chen S (1995) An empirical examination of capital&#13; budgeting techniques: impact of investment types and firm&#13; characteristics, Engineering Economist, 40 (2): 145-170&#13; Chinyio E A, Olomolaiye P O and Corbett P (1998) Evaluation&#13; of the project needs of UK building clients, International&#13; Journal of Project Management, 16 (6): 385-391&#13; Chiu C Y and Park C S (1994) Fuzzy cash flow analysis using&#13; present worth criterion, The Engineering Economist, 39 (2):&#13; 113-138&#13; Ciribini A, De AnGelis E and Marasso L (1993) Life cycle&#13; costing in the refurbish and rehabilitation projects, Economic&#13; evaluation and the built environment, Lisbon 1993: 21-33&#13; Clift M and Bourke K (1999) Study on whole life costing, BRE&#13; Report 367, CRC&#13; Clemen R T and Winkler R L (1999) Combining probability&#13; distributions from experts in risk analysis, Risk Analysis 19&#13; (2): 187-203&#13; Committee for Terotechnology (1977) Life cycle costing in&#13; the management of assets, Her Majesty\u2019s Stationery Office,&#13; London&#13; CPN (2000) Whole life costing: the new BS-ISO standard,&#13; Members\u2019 report E01444, CIRIA&#13; Curwin J and Slater R (1996) Quantitative methods for&#13; business decisions, Fourth edition, International Thomson&#13; Business Press, London&#13; Dale S J (1993) Introduction to life cycle costing, in Bull J W&#13; (ed) Life cycle costing for construction, Blackie Academic &#13; Professional, Glasgow&#13; Edwards P J and Bowen P A (1998) Practices, barriers and&#13; benefits of risk management process in building services&#13; cost estimation: comment, Construction Management and&#13; Economics, 16: 105-108&#13; Edwards S, Bartlett E and Dickie I (2000) Whole life costing&#13; and life-cycle assessment for sustainable building design, BRE&#13; Digest 452, CRC, London&#13; El-Haram M A and Horner R M W (1998) Factors affecting life&#13; cycle cost in the construction industry, Proceedings of the 8th&#13; International MIRCE Symposium: 229-240&#13; Fabrycky W J and Blanchard B S (1991) Life-cycle cost and&#13; economic analysis, Printice-Hall Inc, NJ&#13; Ferrari P and Savoia M (1998) Fuzzy number theory to obtain&#13; conservative results with respect to probability, Computer&#13; Methods in Applied Mechanics and Engineering, 160 (3-4):&#13; 205-222&#13; Ferry D J O and Flanagan R (1991) Life cycle costing \u2013 a&#13; radical approach, CIRIA Report 122, London&#13; Finch E F (1994) The uncertainty role of life cycle costing&#13; in the renewable energy debate, Renewable Energy, 5 (II):&#13; 1436-1443&#13; Flanagan R, Norman G and Furbur D (1983) Life cycle costing&#13; for construction, Surveyors Publications&#13; Flanagan R, Kendell A, Norman G and Robinson G (1987)&#13; Life cycle costing and risk management, Construction&#13; Management and Economics, 5: 53-71&#13; Flanagan R, Norman G, Meadows J and Robinson G (1989)&#13; Life cycle costing \u2013 theory and practice, BSP Professional&#13; Books&#13; Flanagan R and Norman G (1993) Risk management and&#13; construction, Blackwell Scientific Publications&#13; Garnett N and Owen K (1995) Life cycle costing techniques:&#13; how the construction industry could learn from other&#13; industries, the RICS Construction and Building Research&#13; Conference (COBRA\u201995)&#13; Goumas M G, Lygerou V A and Papayannakis L E (1999)&#13; Computational methods for planning and evaluating&#13; geothermal energy projects, Energy Policy, 27: 147-154&#13; Griffin J J (1993) Life cycle cost analysis: a decision aid, in&#13; Bull J W (ed), Life cycle costing for construction, Blackie&#13; Academic  Professional, Glasgow&#13; HAPM (1992) HAPM Component life manual, E  F N Spon,&#13; London&#13; HAPM (1999a) HAPM Component life manual CD-ROM,&#13; Housing Association Property Mutual Ltd, London&#13; HAPM (1999b) Guide to defect avoidance, Housing&#13; Association Property Mutual Ltd, London&#13; HAPM (1999c) Workmanship checklists, Housing Association&#13; Property Mutual Ltd, London&#13; Hermans M H (1999) Building performance starts at handover:&#13; the importance of life span information, Proceedings of&#13; the eighth international conference on durability of building&#13; materials and components, Vancouver, Canada, May 30 -&#13; June 3, 3: 1867-1873&#13; HMSO (1992) Life cycle costing, HM Treasury, Her Majesty\u2019s&#13; Stationery Office, London&#13; HMSO (1991) Economic appraisal in central government: a&#13; technical guide for government departments, HM Treasury,&#13; Her Majesty\u2019s Stationery Office, London&#13; HMSO (1997) The green book \u2013 appraisal and evaluation in&#13; central government: treasury guidance, HM Treasury, Her&#13; Majesty\u2019s Stationery Office, London&#13; Hoar D and Norman G (1990) Life cycle cost management,&#13; in P S Brandon (Ed) Quantity surveying techniques \u2013 new&#13; directions, BSP Professional Books, Oxford&#13; Hobbs S (1977) Collection and use of building maintenance&#13; cost data, Building Research Establishment (BRE),&#13; Department Of Environment, Current Paper October 1977&#13; Hodges N (1996) The economic management of physical&#13; assets, MEP, London&#13; Holmes R, Droop C and Mellor P (1985) A coding system for&#13; building maintenance, Technical Information Service No. 47,&#13; The Chartered Instsitue of Building&#13; Jovanovic P (1999) Application of sensitivity analysis in&#13; investment project evaluation under uncertainty and risk,&#13; International Journal of Project Management, 17 (4): 217-222&#13; Kahraman C and Tolga E (1995) The effects of fuzzy inflation&#13; rate on after-tax rate calculations, Third Balkan Conference&#13; on Operational Research, Thessaloniki, Greece, 16-19&#13; October&#13; Kahraman C, Tolga E and Ulukan Z (2000) Justification of&#13; manufacturing technologies using fuzzy benefit\/cost ratio&#13; analysis, International Journal of Production Economics, 66:&#13; 45-52&#13; Kaufmann A and Gupta M M (1985) Introduction to fuzzy&#13; mathematics, Van Nostrand Reinhold Inc, New York&#13; Kaufmann A and Gupta M M (1988) Fuzzy mathematical&#13; models in engineering and management science, Elsevier&#13; Science Publishers B V, Netherlands&#13; Kelly J and Male S (1993) Value management in design and&#13; construction, E  F Spon&#13; Khanduri A C, Bedard C and Alkass S (1993) Life cycle&#13; costing of office buildings at the preliminary design&#13; stage, Developments in civil and construction engineering&#13; computing, August: 1-8&#13; Khanduri A C, Bedard C, and Alkass S (1996) Assessing&#13; office building life cycle costs at preliminary design stage,&#13; Structural Engineering Review, 8 (2-3): 105-114&#13; Kirk S J and Dell\u2019Isola A J (1995) Life cycle costing for design&#13; professionals, McGrew-Hill Book Company, New York&#13; Kirkham R J, Boussabaine, Grew R G and Sinclair S P (1999)&#13; Forecasting the running costs of sport and leisure centres,&#13; Proceedings of the eighth international conference on&#13; durability of building materials and components, Vancouver,&#13; Canada, May 30 \u2013 June 3, 3: 1728-1738&#13; Kishk M (2001) An integrated fuzzy approach to whole life&#13; costing based decision making, Unpublished PhD thesis, Scott&#13; Sutherland School, The Robert Gordon University&#13; Kishk M and Al-Hajj A, (1999) An integrated framework for&#13; life cycle costing in buildings, Proceedings of COBRA 1999&#13; \u2013 The challenge of change: construction and building for the&#13; new millennium, RICS, Vol 2: 92-101&#13; Kishk M and Al-Hajj A (2000a) A fuzzy approach to model&#13; subjectivity in life cycle costing, Proceedings of the BF2000&#13; national conference of postgraduate research in the built and&#13; human environment, 9-10 March 2000, The University of&#13; Salford: 270-280&#13; Kishk M and Al-Hajj A (2000b) A fuzzy model and algorithm&#13; to<br \/>\nhandle subjectivity in life cycle costing based decisionmaking,&#13; Journal of Financial Management of Property and&#13; Construction, No 1-2, Vol 5: 93-104&#13; Kishk M and Al-Hajj A (2000c) Modelling of life cycle costs of&#13; alternatives with different lives, accepted for publication, the&#13; 16th annual conference of the Association of Researchers in&#13; Construction Management, Glasgow Caledonian University,&#13; 6-8 September 2000, Vol 2: 577-586&#13; Kishk M and Al-Hajj A (2000d) Handling linguistic&#13; assessments in life cycle costing \u2013 a fuzzy approach,&#13; Proceedings of COBRA, RICS Research Foundation: 228-243&#13; Kishk M and Al-Hajj A (2001a) Integrating subjective and&#13; stochastic data in life cycle costing calculations, Proceedings&#13; of the first international postgraduate research conference in&#13; the Built and Human Environment: 329-345&#13; Kishk M and Al-Hajj A (2001b) An innovative approach to&#13; integrating the analysis of uncertainty into life cycle costing,&#13; Proceedings of the first international conference of Innovation&#13; in Architecture, Engineering and Construction: 411-421&#13; Kishk M, Al-Hajj A and Pollock R (2001) Inclusion of nonfinancial&#13; factors in life-cycle decision-making \u2013 a fuzzy&#13; approach, Proceedings of the 17th Annual Conference of the&#13; Association of Researchers in Construction Management, 1:&#13; 411-420&#13; Ko W I, Choi J W, Kang C H and Lee J S (1998) Nuclear fuel&#13; cycle cost analysis using a probabilistic simulation technique,&#13; Annals of Nuclear Energy, 25: 771-789&#13; Kosko B (1997) Fuzzy engineering, Prentice Hall International&#13; Inc, NJ&#13; Kuchta D (2000) Fuzzy capital budgeting, Fuzzy Sets and&#13; Systems, 111: 367-385&#13; Larsson N and Clark J (2000) Incremental costs within&#13; the design process for energy efficient buildings, Building&#13; Research  Information, 28 (5\/6): 413\u2013418&#13; Liang P and Song F (1994) Computer-aided risk evaluation&#13; system for capital investment, Omega, 22 (4): 391-400&#13; Lopes M D S and Flavell R (1998) Project appraisal \u2013 a&#13; framework to assess non-financial aspects of projects during&#13; the project life cycle, International Journal of Project&#13; Management, 16(4): 223-233&#13; MacKay S (1999) Building for life, the Building Economist:&#13; 4-9&#13; Martin J (1992) Occupancy costs, Construction Papers No. 3,&#13; CIOB&#13; Mathur K and McGeorge D (1990) Property maintenance&#13; \u2013 a simulation approach, Proceddings of CIB 70 Conference,&#13; Singapore: 162-171&#13; McDermott F, Torrance V B and Chessman P G (1987)&#13; Forecasting lifespan for life cycle costing, in Spedding A (Ed),&#13; Building maintenance economics and management, E  F N&#13; Spon, London&#13; McGeorge J F (1993) The quality approach to design and life&#13; cycle costing in the health service, in Bull J W (Ed) Life cycle&#13; costing for construction, Blackie Academic  Professional,&#13; Glasgow&#13; Mohamed S and McCowan A K (2001) Modelling project&#13; investment decisions under uncertainty using possibility&#13; theory, International Journal of Project Management 19: 231-&#13; 241&#13; Neely Jr E S and Neathammaer R (1991) Life-cycle&#13; maintenance cost by facility use, Journal of Construction&#13; Engineering And Management, 117 (2): 310-320&#13; Norton B (1992) Value added, Chartered Quantity Surveyor,&#13; June: 21-23&#13; Paulson B C (1976) Designing to reduce construction costs,&#13; Journal of Construction Division, ASCE, 102: 587-592&#13; Picken D H (1989) An investigation into the development and&#13; practice of life cycle costing for construction, MSc Thesis,&#13; Department of Civil Engineering, University of Salford&#13; Piper J (1996) Window selection economics: to achieve the&#13; mostcost-effective solution, you\u2019ll need to evalutae life-cycle&#13; costs, Trade Press Publishing Corporation&#13; RICS (1986) A guide to life cycle costing for construction,&#13; Surveyors Publications&#13; RICS (1987) Life cycle costing: a worked example, Surveyors&#13; Publications&#13; RICS (1999) Surveyors\u2019 construction handbook, RICS&#13; Business Services Limited, London&#13; RICS\/BRE (1992) Life expectancies of building components:&#13; preliminary results from survey of building surveyors\u2019 views,&#13; Research Papers, No. 11, RICS&#13; Ross T J (1995) Fuzzy logic with engineering applications:&#13; international edition, McGraw-Hill Inc&#13; Ruegg R T and Marshall H E (1990) Building economics:&#13; theory and practice, Van Nostrand Reinhold, New York&#13; Salway F (1986) Depreciation of commercial property, College&#13; of Estate Management&#13; Seeley I H (1996) Building economics: fourth edition,&#13; Macmillan Press Ltd&#13; Smith D K (1999) Total life-cycle cost, Proceedings of the&#13; eighth international conference on durability of building&#13; materials and components, Vancouver, Canada,<\/p>\n<div align=\"center\"> <img decoding=\"async\" src=\"http:\/\/ihelptostudy.com\/other\/essay-468.gif\" alt=\"Low cost essay writing\"\/><\/div>\n<h3>Actions (login required)<\/h3>\n<p><center><iframe loading=\"lazy\" width=\"420\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/tuYW_lZ1Q3M\" frameborder=\"0\" allowfullscreen=\"\"><\/iframe><br \/><\/center><\/p>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>01 Dec 2015 00:03 Aikivuori A (1996) Periods and demand for private sector&#13; housing refurbishment, Construction Management and&#13; Economics, 14: 3-12&#13; Al-Hajj A (1991) Simple cost-significant models for total lifecycle&#13; costing in buildings. PhD Thesis, Department of Civil&#13; Engineering, University <a href=\"https:\/\/www.benedictsol.com\/blogs\/whole-life-cycle-costing-dissertation-proposal\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,15],"tags":[],"class_list":["post-435081","post","type-post","status-publish","format-standard","hentry","category-dissertations","category-essay-paper-writing"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/435081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=435081"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/435081\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=435081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=435081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=435081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}