{"id":225026,"date":"2018-09-17T06:06:44","date_gmt":"2018-09-17T06:06:44","guid":{"rendered":"http:\/\/localhost\/wordpress\/index.php\/2018\/09\/17\/inf-410-week-2-quiz\/"},"modified":"2018-10-24T08:44:45","modified_gmt":"2018-10-24T08:44:45","slug":"inf-410-week-2-quiz","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/inf-410-week-2-quiz\/","title":{"rendered":"INF 410 Week 2 Quiz"},"content":{"rendered":"<p>Quiz: \t1. \ufffd\u00a0\u00a0\u00a0 The backward pass in project network calculations determines the\t\u00a0\t2. \ufffd\u00a0\u00a0\u00a0 People working on prototype development needing time to interact with the design engineers after the design is completed is an example of:\t\u00a0\t3. \ufffd\u00a0\u00a0\u00a0 Learning curves are more likely to apply in situations where most of the costs are\t\u00a0\t4. \ufffd\u00a0\u00a0\u00a0 The project structure chosen to manage the project will have little impact on the actual project work to be accomplished.\t\u00a0\t5. \ufffd\u00a0\u00a0\u00a0 Scope definitions are usually brief with only one or two pages being typical for small projects. \t\u00a0\t6. \ufffd\u00a0\u00a0\u00a0 The ideal approach to estimating project time and costs is to use both the top-down and the bottom-up approach. \t\u00a0\t7. \ufffd\u00a0\u00a0\u00a0 Nodes on an AON project network represent: \t\u00a0\t8. \ufffd\u00a0\u00a0\u00a0 General and Administrative costs are usually allocated as a percent of the total of a direct cost such as labor, materials, or equipment. \t\u00a0\t9. \ufffd\u00a0\u00a0\u00a0 By definition, the critical path always has zero slack. \t\u00a0\t10. \ufffd\u00a0 In a breakdown structure deliverables are ignored and replaced with activities or tasks that have been grouped in phases.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quiz: 1. \ufffd\u00a0\u00a0\u00a0 The backward pass in project network calculations determines the \u00a0 2. \ufffd\u00a0\u00a0\u00a0 People working on prototype development needing time to interact with the design engineers after the design is completed is an example of: \u00a0 3. \ufffd\u00a0\u00a0\u00a0 <a href=\"https:\/\/www.benedictsol.com\/blogs\/inf-410-week-2-quiz\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-225026","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/225026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=225026"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/225026\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=225026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=225026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=225026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}