{"id":204933,"date":"2018-09-14T04:48:46","date_gmt":"2018-09-14T04:48:46","guid":{"rendered":"http:\/\/localhost\/wordpress\/index.php\/2018\/09\/14\/bus-430-quiz-10\/"},"modified":"2018-10-24T08:48:14","modified_gmt":"2018-10-24T08:48:14","slug":"bus-430-quiz-10","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/bus-430-quiz-10\/","title":{"rendered":"BUS 430 Quiz 10"},"content":{"rendered":"<p>1. \ufffd\u00a0 In a Kanban system, the numerator of the formula K = [d(p + w)(1 + \u03b1)]\/C is analogous to\t2. \ufffd\u00a0 Quick setup or changeover of tooling and fixtures is associated with ____.\t3. \ufffd\u00a0 Ford Motor Company has decided to switch to a pull system of manufacturing and distribution for its vehicles. Which one of the following is most likely to occur?\t4. \ufffd\u00a0 A withdrawal Kanban\t5. \ufffd\u00a0 Which of the following is\u00a0not\u00a0one of the 5Ss?\t6. \ufffd\u00a0 Which of the following is\u00a0not\u00a0a basic principle of a lean operating system?\t7. \ufffd\u00a0 Which of the following is\u00a0least\u00a0related to a pull system?\t8. \ufffd\u00a0 Total Production Maintenance (TPM)\t9. \ufffd\u00a0 The number of Kanban cards is dependent on all of the following\u00a0except\t10.\u00a0\u00a0 Southwest Airlines illustrates the application of &#8220;lean principles&#8221; when it\t11.\u00a0\u00a0 Long lead-times and higher work-in-process is most closely related to which of Toyota&#8217;s &#8220;Seven Major Waste Categories?&#8221;\t12.\u00a0\u00a0 Toyota classified waste into seven major categories.\u00a0 Those categories include all of the following\u00a0except\t13.\u00a0\u00a0 Total productive maintenance (TPM) seeks to do all of the following except ____.\t14.\u00a0\u00a0 ABC Manufacturing uses a Kanban system for a component. The daily demand is 800 units. Each container has a combined waiting and processing time of 0.34 days. If the container size is 50 and efficiency (safety) factor is 9 percent, how many Kanban card sets should be authorized (round up)?\t15.\u00a0\u00a0 Which of the following is\u00a0least\u00a0related to a push system?\t16.\u00a0\u00a0 A type of organization which &#8220;loans&#8221; resources to projects while still maintaining control over them is called\t17.\u00a0\u00a0 Which of the following is\u00a0least\u00a0related to Program Evaluation and Review Technique (PERT)?\t18.\u00a0\u00a0 Which of the following is\u00a0not\tconsidered a project?\t19.\u00a0\u00a0 Which of the following is\u00a0incorrect\u00a0regarding time\/cost trade-offs?\t20.\u00a0\u00a0 In which stage in the project life cycle would crashing likely be performed?\t21.\u00a0\u00a0 A type of organization that can result in inefficiencies because of duplication of resources across the organization is called\t22.\u00a0\u00a0 The county government has decided to redo the street you live on and plans to block the street off which causes you and your neighbor&#8217;s considerable inconvenience. The project has three parallel paths defined as follows: (i) path A-B-C-H to install street lights and electrical wiring that takes 16 days, (ii) path A-D-E-H to install sidewalks with handicap capabilities that takes 22 days, and (iii) path A-F-G-H to repave the street including storm drains that takes 30 days. Which one of the following statements istrue?\t23.\u00a0\u00a0 Slack in an activity is computed as\t24.\u00a0\u00a0 A project has three paths. A-B-C has a length of 25 days. A-D-C has a length of 15 days. Finally, A-E-C has a length of 20 days. Which one of the following statements istrue?\t25.\u00a0\u00a0 Which statement is\u00a0true\u00a0regarding activities\u00a0not\u00a0on the critical path?\t26.\u00a0\u00a0 In which stage in the project life cycle would a Gantt chart be used?\t27.\u00a0\u00a0 Which step in the project management process would involve developing alternative plans in anticipation of problems that might arise?\t28.\u00a0\u00a0 Which of the following is\u00a0not\u00a0an assumption of the critical path method?\t29.\u00a0\u00a0 Which of the following is\u00a0not\u00a0a stage in the project life cycle?\t30.\u00a0\u00a0 In which stage in the project life cycle would critical path calculations be performed?<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1. \ufffd\u00a0 In a Kanban system, the numerator of the formula K = [d(p + w)(1 + \u03b1)]\/C is analogous to 2. \ufffd\u00a0 Quick setup or changeover of tooling and fixtures is associated with ____. 3. \ufffd\u00a0 Ford Motor Company <a href=\"https:\/\/www.benedictsol.com\/blogs\/bus-430-quiz-10\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-204933","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/204933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=204933"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/204933\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=204933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=204933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=204933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}