{"id":151936,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/civil"},"modified":"2017-08-17T17:53:21","modified_gmt":"2017-08-17T17:53:21","slug":"civil","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/civil\/","title":{"rendered":"Civil"},"content":{"rendered":"<p>The student must indicate the page number where the evidence can be found.<\/p>\n<p>&nbsp;<\/p>\n<p><i align=\"center\"> <\/p>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"113\">Criteria <\/p>\n<p>Assessed:<\/p>\n<\/td>\n<td valign=\"top\" width=\"422\">To achieve the criteria the evidence must show that the learner is able to:<\/td>\n<td valign=\"top\">Task <\/p>\n<p>Number<\/p>\n<\/td>\n<td valign=\"top\" width=\"74\">Page <\/p>\n<p>Number<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"113\">&nbsp; 1.1:<\/td>\n<td valign=\"top\" width=\"422\">Determine resource requirements for construction projects<\/td>\n<td valign=\"top\">\n<p align=\"center\">1<\/p>\n<\/td>\n<td valign=\"top\" width=\"74\">\n<p align=\"center\">1<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"113\">&nbsp; 1.2:<\/td>\n<td valign=\"top\" width=\"422\">Perform calculations for project planning and cost analysis.<\/td>\n<td valign=\"top\">\n<p align=\"center\">2<\/p>\n<\/td>\n<td valign=\"top\" width=\"74\">\n<p align=\"center\">2<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"113\">M1.2:<\/td>\n<td valign=\"top\" width=\"422\">Complex problems with more than variable have been explored<\/td>\n<td valign=\"top\">\n<p align=\"center\">3<\/p>\n<\/td>\n<td valign=\"top\" width=\"74\">\n<p align=\"center\">2<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><b>&nbsp;<\/b><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Summary of learning outcomes:<\/p>\n<p>&nbsp;<\/p>\n<p>L01: Be able to apply analytical methods to construction problems<\/p>\n<p>&nbsp;<\/p>\n<p>The following student tasks have been set to enable successful completion of this assignment.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><b>Task 1:<\/b> Assume you have been asked to determine the resource requirements for a rectangular building with two doors and two windows. The construction is to have a pitched roof of imitation slates. The company wishes to offer customers the same basic rectangular shape building however with different lengths and widths.<\/p>\n<p>&nbsp;<\/p>\n<p>The building is to be constructed of brick outer skin and block work for the inner skin.<\/p>\n<p>&nbsp;<\/p>\n<p>Obtain a set of formulae that will allow you to cost the construction given its length and height in metres.<\/p>\n<p>&nbsp;<\/p>\n<p>Consider the following:<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>The volume of concrete required for the foundations.<\/li>\n<li>The number of tiles required.<\/li>\n<li>Itemising the electrical components<\/li>\n<li>Plumbing<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>For each of the above requirements you are to use analytical methods in your approach to solving the problem.<\/p>\n<p>&nbsp;<\/p>\n<p>Include a factor for costing each aspect of the construction identified above.<\/p>\n<p>It is suggested that Excel is used to present the data.<\/p>\n<p>&nbsp;<\/p>\n<p>Discuss how profit and loss may be represented using two straight line graphs. Variable and fixed costs and numbers of items sold must be taken into account.<\/p>\n<p><b>&nbsp;<\/b><\/p>\n<p><b>Task 2:<\/b> The construction company is currently hiring tradesmen to complete two separate projects based on the rectangular building design as above.<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>The wage allocated to each trade is to be the same for each project.<\/li>\n<li>x is the wage of the plumbers and y is the wage of the electricians.<\/li>\n<li>For project 1 there are 10 plumbers and 6 electricians with a total wage bill of \u00a3360000<\/li>\n<li>For project 2 there are 20 plumbers and 10 electricians with a total wage bill of \u00a3670000<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>If the wage for plumber and electrician must be the same on each site calculate the plumbers wage and the electricians\u2019 wage.<\/p>\n<p><b>&nbsp;<\/b><\/p>\n<p>&nbsp;<\/p>\n<p><b>Task3:<\/b> M1.2<\/p>\n<p>&nbsp;<\/p>\n<p>Thermal insulation investigation.<\/p>\n<p>&nbsp;<\/p>\n<p>The temperature loss through a certain type of insulation is given by the following equation.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>T= 25e<sup>(-kw)<\/sup><\/p>\n<p>&nbsp;<\/p>\n<p>K is the insulation coefficient and w is the insulation thickness.<\/p>\n<p>&nbsp;<\/p>\n<p>Plotting suitable graphs what are the two factors that will reduce the outside temperature to 0 degrees assuming the value of T is 25 Celsius on the inside of the building.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Your work should be word processed.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The student must indicate the page number where the evidence can be found. &nbsp; Criteria Assessed: To achieve the criteria the evidence must show that the learner is able to: Task Number Page Number &nbsp; 1.1: Determine resource requirements for <a href=\"https:\/\/www.benedictsol.com\/blogs\/civil\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-151936","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/151936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=151936"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/151936\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=151936"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=151936"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=151936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}