{"id":132699,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/bachelor-of-construction-management-school-of-computing-engineering-mathematics-1-p-a-g-e-assignment-2-value-management"},"modified":"2017-08-16T07:03:17","modified_gmt":"2017-08-16T07:03:17","slug":"bachelor-of-construction-management-school-of-computing-engineering-mathematics-1-p-a-g-e-assignment-2-value-management","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/bachelor-of-construction-management-school-of-computing-engineering-mathematics-1-p-a-g-e-assignment-2-value-management\/","title":{"rendered":"Bachelor of Construction Management School of Computing Engineering &#038; Mathematics 1 | P a g e Assignment 2: Value Management"},"content":{"rendered":"<div class=\"the_content_wrapper\">\n<p>Bachelor of Construction Management<br \/> School of Computing Engineering &amp; Mathematics 1 | P a g e<br \/> Assignment 2: Value Management<br \/> Weight 25%<br \/> Type of Collaboration Group<br \/> Due 26 May 201 11:59 p.m.<br \/> Submission Submit through TurnitIn<br \/> Format 5 group members agreed with the lecturer: email group members<br \/> name by week 2<br \/> Length 3000 words<br \/> Curriculum Mode Applied Project<br \/> General Instructions<br \/> Learning Outcome<br \/> It is expected that students will be able to demonstrate their level of knowledge and understanding<br \/> of Value Management (VM) and the ability to apply VM concepts to a real life project scenario.<br \/> Brief<br \/> You are required to identify a real life construction project (either proposals stage, being built or<br \/> completed) bearing in mind you would be in a position to have reasonable access to overall project<br \/> data (required to perform VM). You should be in a position to clearly understand the project and key<br \/> details of the project including (but not limited to) type of building (or structure), location, overall<br \/> cost, primary and secondary project objectives, key stakeholders, design details (size \u2013 area, plan<br \/> shape, height, specification etc.), among others. You are required to apply VM to the selected<br \/> project (or a component or element of the construction project selected). The application of VM can<br \/> be at Value Planning, Value Engineering or Value Analysis stage depending on the nature and state<br \/> of the development of the design. You may use any approach to VM in executing and applying VM<br \/> principles to the project. This assignment should demonstrate your understanding of VM principles<br \/> and its application to projects and is written in a manner to showcase the use of VM in construction<br \/> projects as a way to improve value characteristics of the project.<br \/> You are generally expected to follow through the following process identified.<br \/> ? Identify an application area (whole project, building, structure, element, component etc.)<br \/> and define the objectives of applying VM. i.e. explain what do you want to achieve through<br \/> application of VM.<br \/> ? Explain the process of VM application clearly going through the stages of the Job Plan (in<br \/> VM). Explain in detail how each stage is executed and apply techniques required.<br \/> ? You are required to provide:<br \/> o Project brief<br \/> o Problem analysis<br \/> o Alternative solutions considered<br \/> o Critical evaluation of alternative solutions<br \/> o Use of value matrix, FAST or SMART or other appropriate technique<br \/> o Detailed development of the solution<br \/> o Final proposal recommendation<br \/> o Analysis of benefits and risks<br \/> o Implementation plan<br \/> Bachelor of Construction Management<br \/> School of Computing Engineering &amp; Mathematics 2 | P a g e<br \/> ? You are required to write a final report incorporating all of the above aspects. The report<br \/> would be appropriately referenced and produced in a professional manner as a professional<br \/> report to be presented to the building client of the project.<br \/> ? The full report should also include a short literature review indicating relevant literature on<br \/> VM and providing information to justify the use of VM in improving value characteristics of<br \/> the project concerned.<br \/> ? Demonstrate the use (or knowledge) of using the Australian \/New Zealand Standard<br \/> (AS4183: 2007 Value Management) and also compare with NSW Treasury Value<br \/> Management process.<br \/> Approach<br \/> You are required to form your own groups of 5 and report to the lecturer as to the formation of your<br \/> group. Detailed instructions of how you report group formation will be provided to you at the time<br \/> of handing of the assignment.<br \/> Submission Requirements<br \/> The final report should be submitted via Turnitin on the due date.<br \/> Assessment Criteria<br \/> The following and the Marking Criteria rubric indicate the assessment criteria used for this<br \/> assignment:<br \/> VM review (20%)<br \/> Problem analysis and alternative solutions (15%)<br \/> Evaluation of solutions and development (30%)<br \/> Understanding of the VM process (15%)<br \/> Report writing and presentation (20%)<br \/> (Style of writing, overall presentation, referencing, citations, general structure, readability,<br \/> group approach, use of figures and tables and cross referencing)<br \/> Bachelor of Construction Management<br \/> School of Computing Engineering &amp; Mathematics 3 | P a g e<br \/> Marking Criteria<br \/> Criteria High Distinction Distinction Credit Pass Unsatisfactory<br \/> VM review (20%) Demonstrate an<br \/> excellent level of<br \/> understanding of<br \/> VM concept and its<br \/> application through<br \/> a thorough review<br \/> of literature.<br \/> Demonstrate a very<br \/> good level of<br \/> understanding of VM<br \/> concept and its<br \/> application through a<br \/> detailed review of<br \/> literature.<br \/> Demonstrate a sound<br \/> level of understanding<br \/> of VM concept and its<br \/> application through a<br \/> good review of<br \/> literature.<br \/> Demonstrate an<br \/> adequate level of<br \/> understanding of VM<br \/> concept and its<br \/> application through a<br \/> basic review of<br \/> literature.<br \/> Demonstrate and poor<br \/> level of understanding<br \/> of VM concept and its<br \/> application with a<br \/> scant review of<br \/> literature.<br \/> Problem analysis and<br \/> alternative solutions<br \/> (15%)<br \/> Demonstrates a<br \/> comprehensive and<br \/> structured analysis<br \/> of the problem and<br \/> issues and their<br \/> possible creative<br \/> alternative<br \/> solutions.<br \/> Demonstrates a very<br \/> good and structured<br \/> analysis of the<br \/> problem and issues<br \/> and their possible<br \/> creative alternative<br \/> solutions.<br \/> Presents a sound and<br \/> detailed analysis of the<br \/> problem and issues<br \/> and their possible<br \/> creative alternative<br \/> solutions.<br \/> Presents a basic level<br \/> of analysis of the<br \/> problem and issues<br \/> and their possible<br \/> creative alternative<br \/> solutions.<br \/> Demonstrates a lack of<br \/> understanding of the<br \/> problem and a weak<br \/> presentation of<br \/> alternative solutions.<br \/> Evaluation of solutions<br \/> and development (30%)<br \/> Critical and<br \/> systematic<br \/> evaluation of<br \/> alternative<br \/> solutions and<br \/> detailed<br \/> development of the<br \/> proposed solution.<br \/> Detailed and<br \/> systematic evaluation<br \/> of alternative solutions<br \/> and detailed<br \/> development of the<br \/> proposed solution.<br \/> Systematic evaluation<br \/> of alternative solutions<br \/> and detailed<br \/> development of the<br \/> proposed solution.<br \/> Basic level of<br \/> evaluation of<br \/> alternative solutions<br \/> and development of<br \/> the proposed solution.<br \/> Inadequate level of<br \/> evaluation of<br \/> alternative solutions<br \/> and poor level of detail<br \/> of the proposed<br \/> solution.<br \/> Understanding of the VM<br \/> process (15%)<br \/> Outstanding level of<br \/> understanding of<br \/> processes of VM<br \/> considering the<br \/> stages of the Job<br \/> Plan.<br \/> Very good level of<br \/> understanding of<br \/> processes of VM<br \/> considering the stages<br \/> of the Job Plan.<br \/> Good level of<br \/> understanding of<br \/> processes of VM<br \/> considering the stages<br \/> of the Job Plan.<br \/> Basic level of<br \/> understanding of<br \/> processes of VM<br \/> considering the stages<br \/> of the Job Plan.<br \/> Poor level of<br \/> understanding of<br \/> processes of VM<br \/> considering the stages<br \/> of the Job Plan.<br \/> Bachelor of Construction Management<br \/> School of Computing Engineering &amp; Mathematics 4 | P a g e<br \/> Report writing and<br \/> presentation (20%)<br \/> (Style of writing, overall<br \/> presentation,<br \/> referencing, citations,<br \/> general structure,<br \/> readability, group<br \/> approach, use of figures<br \/> and tables and cross<br \/> referencing)<br \/> An outstanding<br \/> report in all aspects.<br \/> A very good report<br \/> with excellent<br \/> performance in some<br \/> aspects.<br \/> A good report<br \/> communicating the<br \/> key findings and the<br \/> use of VM.<br \/> A basic report with<br \/> some degree of<br \/> adherence to good<br \/> practice in report<br \/> writing.<br \/> A poor report that<br \/> does not adequately<br \/> communicate with<br \/> poor performance in<br \/> multiple aspects of<br \/> report writing.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Bachelor of Construction Management School of Computing Engineering &amp; Mathematics 1 | P a g e Assignment 2: Value Management Weight 25% Type of Collaboration Group Due 26 May 201 11:59 p.m. Submission Submit through TurnitIn Format 5 group members <a href=\"https:\/\/www.benedictsol.com\/blogs\/bachelor-of-construction-management-school-of-computing-engineering-mathematics-1-p-a-g-e-assignment-2-value-management\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-132699","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/132699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=132699"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/132699\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=132699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=132699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=132699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}