{"id":125989,"date":"2018-02-20T23:50:30","date_gmt":"2018-02-20T23:50:30","guid":{"rendered":"https:\/\/writemyessayfree.com\/management-plan"},"modified":"2017-08-16T06:07:16","modified_gmt":"2017-08-16T06:07:16","slug":"management-plan","status":"publish","type":"post","link":"https:\/\/www.benedictsol.com\/blogs\/management-plan\/","title":{"rendered":"Management plan"},"content":{"rendered":"<div class=\"the_content_wrapper\">\n<p>The network\u2019s project has been&nbsp; awarded to&nbsp; a company\u2019s team 4&nbsp; to serve in executing nokia network system. The management department of team4 plan to implement the router\u2019s network system scheme in the new branch office. The network is to link the local&nbsp; offices department to their headquarter.<\/p>\n<p>&nbsp;<\/p>\n<p>The company seek to include the new local branch services&nbsp; in one local network. They need to be in touch with one another department remotely&nbsp; in order to supervisor their committed works in one of directed sites.<\/p>\n<p>This local network project is an extension of the current network that in the&nbsp; in main centre of company(1). This new network function to connect two company building in one network . this aim at making the communication easyer and organize the task between its administrative departments and employees as well as they can provide an access to obtain the data from datservers .<\/p>\n<p>&nbsp;<\/p>\n<p>new local branch network must be completed in a limited time and budget as the company will use this branch network for managing the project site . The network development period should be concluded before the commencement date of company\u2019s major project in order to support communication between remote departments.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>a company might be planning to merge with another organization in the near future, and wants to ensure that the new network will be able to scale in a manner suitable to supporting new users, connections, and more<\/p>\n<p><strong>&nbsp;<\/strong><\/p>\n<p><strong>&nbsp;<\/strong><\/p>\n<p><strong>&nbsp;<\/strong><\/p>\n<p><strong>The project phases : <\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Design phases: <\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>Design IP address network scheme<\/p>\n<p>&nbsp;<\/p>\n<p>Planning IP addresses is the basic in the network design. IP public address&nbsp; will be&nbsp; obtained from provider to design the IP addresses in the&nbsp; private&nbsp; network. The company decided to have # subnets he risk requirement of the future : employees \/ office ability<\/p>\n<p>the company structure&nbsp; Improve the network\u2019s scalability<\/p>\n<p>&nbsp;<\/p>\n<p>The design play roles is to Simplify network management. Design user codes and names and match them to other company codes. These rely on the company structure, offices location locations. Also, design routers places are required layer building design and the server room.<\/p>\n<p>&nbsp;<\/p>\n<p>The design in the network system may&nbsp; more be required to improve network performance.Manage network system&nbsp; and high-availability rate to communicate in&nbsp; the network. This depends on company applications and scheduled task and&nbsp; defining which users need . For example, a company might still be using 10 Mbps Ethernet hubs for connectivity on some LANs,The connectivity of the current network is allowed to access (\u2026) Mbps ethernet. The company want to the rate of access data take the normal average when the new network start running at peak rate. There may a need&nbsp; to increase the level of connection&nbsp; performance at the layer 3 and layer 2 by determining&nbsp; Fast Ethernet and dedicated switches for the&nbsp; part of network systems.<\/p>\n<p>&nbsp;<\/p>\n<p>Specify routers kind<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>construction phase<\/li>\n<\/ul>\n<p>connectivity<\/p>\n<p>implementation of new software<\/p>\n<p>deploy software routers<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Operation phase<\/li>\n<\/ul>\n<p>The Software administrator &nbsp;has the task that configures and perpara routers software system and hardware components.They also are responsible for&nbsp; the enhancement of network security. For example, proxy and firewalls or intrusion detection systems.Also the Security setting &nbsp;include the configuration of its routes and filters as there is a need to&nbsp; specific route control traffic and filter routers packet .<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Development phase<\/li>\n<\/ul>\n<p>This stage are used to at stage of completing the part big of managment plan. The development are added and edited to the project when there is a&nbsp; requirement&nbsp; or recommendation from the owner. For example, creating more point connection or expand&nbsp; the&nbsp; location construction suh as&nbsp; (annex office site .Increase network scalability<\/p>\n<ul>\n<li>Track &amp; manage<\/li>\n<\/ul>\n<p>troubleshooting server \/ networking problem \/exchange data between server application software.<\/p>\n<p>Improve network security<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>Operation phase<\/li>\n<\/ul>\n<p>Implement QoS<\/p>\n<ul>\n<li><\/li>\n<li>\u2013 testing phase<\/li>\n<\/ul>\n<p>verification local between router for configuration external .<\/p>\n<p>training phase<\/p>\n<p>IT staff<\/p>\n<p><strong>&nbsp;<\/strong><\/p>\n<p>Training traingi materials<\/p>\n<p>Delevry of training sessions for IT<\/p>\n<p><strong>&nbsp;<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Planning do<\/p>\n<ul>\n<li>System req specification<\/li>\n<li>Softwrae req specification<\/li>\n<li>Software design specification<\/li>\n<li>System test paln software project managment plan (this document )<\/li>\n<\/ul>\n<p>Software realted to products<\/p>\n<p>Software required for \u2026<\/p>\n<p>Excutable code<\/p>\n<p>End used documnetation including tutorial and users guide<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>A key to sucess fr any project is to control changes , is invitabke ,<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The network\u2019s project has been&nbsp; awarded to&nbsp; a company\u2019s team 4&nbsp; to serve in executing nokia network system. The management department of team4 plan to implement the router\u2019s network system scheme in the new branch office. The network is to <a href=\"https:\/\/www.benedictsol.com\/blogs\/management-plan\/\" class=\"read-more\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-125989","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/125989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/comments?post=125989"}],"version-history":[{"count":0,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/posts\/125989\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/media?parent=125989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/categories?post=125989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.benedictsol.com\/blogs\/wp-json\/wp\/v2\/tags?post=125989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}